/// Oceanauta

Technical studies to regularize construction permits

Technical studies to regularize construction permits

Preparation of technical studies to meet the notification issued by the responsible body for construction permit requests. As informed by the client, 3 actions were carried out:
1. Sanitary Sewage System Project:
Technical document presenting the physical and operational characteristics of the sanitary sewage collection network project, referring to a study that aims to measure the size of the sanitary sewage network, promoting public health and the social well-being of residents and the environment.
2. Waste management plan for the construction:
Technical document aimed at waste management in the civil construction sector, as well as providing guidance on environmentally viable and sustainable practices at a construction site. The document establishes principles, procedures, norms, and criteria regarding the generation, packaging, storage, collection, transport, and final destination of solid waste generated at the construction site.
3. Land survey report, determining the water table level:
Technical document aimed at verifying the possible risk of contamination of groundwater as a result of the construction of the sanitary sewage system of the enterprise.

/// Portfolio Oceanauta

Alguns dos trabalhos desenvolvidos pela Oceanauta